Structure

Structure

Plants

Total Facility Area 15.000 sqm

Qualified Personnel

FLUITEK ORSENIGO VALVES personnel is qualified to carry out all the above mentioned controls. In particular, for Non Destructive Tests, FLUITEK ORSENIGO VALVES staff includes qualified, certified personnel in accordance with STN-TC-1A and EN 473 requirements as follows:

  • RT Technicians (Radiographic or Gammagraphic Examination) Level II
  • PT Technicians (Dye Penetrant Examination) Level II
  • MT Technicians (Magnetic Particles Examination) Level II
  • UT Technicians (Ultrasonic Examination) Level II
  • VT Technicians (Visual Examination)
  • LT Technicians (Leakage Examination)
  • NDT level III available in-house

Fluitek Production 8